Our company participated in construction works of Ukhaa khudag Thermal Power Plant with capacity of 18MW in Ukhaa khudag Tsogttsetsii soum Umnugobi aimag. We carried out installation and construction of 35 ton/h circulating fluidized boiler#1 and boiler#3, cooling water system, heat exchanger set, coal handling system, ash removal system, lime stone facilities, condenser with air cooler, main header of boiler sharp steam etc.
2012 | 18 MW | Installation work of boiler#1 in Ukhaa khudag “MCS International” LLC |
2012 | 18 MW | Installation work of boiler#3 in Ukhaa khudag “MCS International” LLC |
2012 | 18 MW | Installation work of cooling water system and its auxiliary works “MCS International” LLC |
2012 | 18 MW | Installation work of “MCS International” LLC coal handling system |
2012 | 18 MW | Installation work of ash removal system and lime stone facilities “MCS International” LLC |
2012 | 18MW |
Installation work of condenser with air cooler#1 “MCS International” LLC |